About

ABOUT TAC Services

WHY CHOOSE TAC SERVICES ?

 

After almost 15 years spent within the industry, TAC Services has gathered several experiences in differents fields of operations. 


It all started as a mechanical fitter in a worldwide reknowed factory where the basis were set properly (mechanics, electrical, electronics, instrumentations,...). 


Then a new challenge came within the nuclear industry to develop, implement and qualify services activities on fuel handling equipment. This challenge helped TAC Services develop its skills regarding the project management, training, PLC programming, procedures writting, 


Then TAC services has developped itself its skills within the PLC programming by attempting to Siemens Simatic STEP7 courses. 


During the last 5 years, acting as a Project Manager within the Oil & Gas industry, mainly affected to major industrial boilers revamping, TAC industry has developped proper skills on field regarding the commissionning of the boilers and the controls and automation of these steam producers. 

 

Fields of experience

Oil & Gas 

(Steam Boilers, Heat exchangers, Pressurized vessels, Combustions, Flue Gases Recirculation,...)

Manufacturing Industries

(Concrete manufactures,Ophtalmic industry, production lines,...)

Nuclear Power Plants

(Fuel Handling equipments,Reactor Vessel Head operations, auxiliary pressurized circuits,...)

BASICS

  • Electro-mechanical engineering graduation


DEVELOPPED SKILLS

  • Field management
  • Project management
  • Lean Six Sigma Green Belt
  • Customer relationship
  • Scheduling and project planning (MS Project)
  • Technical specifications writting 
  • Negociation and purchasing
  • Reporting
  • Mechanical design ( Autodesk Inventor, AutoCAD, Solidworks)
  • Electrical design ( Eplan)
  • Detailled functionnal analysis (process)
  • PLC Programming ( Siemens STEP7)
  • PLC Troubleshooting (Schneider, Siemens, Télémécanique, GE Fanuc)

Testing & Inspections


  • I&C testing (bench / field)
  • Safety inspection testings
  • Factory acceptance tests
  • Site acceptance tests
  • Commissionning 

New installs

 

  • Logistic on site
  • Access procedures and controls
  • Qualifications and habilitations
  • HSE supervisor
  • Mounting procedure
  • Lifting procedure
  • Drawings red-marks follow-ups
  • Piping & fittings
  • Pressurized equipments